How a Job Gets Done.Nothing hidden.
Flip each card to see timestamped specs, pressure ratings, and a note from the crew lead who ran that phase.

Site Survey & P&ID Review
We walk the slab before we touch a drawing. Every conflict caught here costs nothing.
Site Survey & P&ID Review
"I pull the P&IDs the night before and mark every elevation conflict in red. When I walk the floor, I'm not discovering—I'm confirming. If the GC's BIM model doesn't match the ceiling grid, we find it here, not after the hangers are in."— Crew Lead, Manifold

Prefabrication & Hydrostatic Testing
Spools built in a controlled shop. Every assembly pressure-tested before it ships.
Prefabrication & Hydrostatic Testing
"Everything we can pre-build, we do. The shop is cleaner than any mechanical room you'll ever visit. We hydrostatic every spool to 1.5× working pressure and log the chart. If it doesn't hold, it doesn't ship. Simple."— Crew Lead, Manifold

Coordinated Install
Sequenced with electrical, fire suppression, and structural—zero interference.
Coordinated Install
"We run the BIM model on the iPad and check every hanger location before the drill comes out. If electrical needs to shift 3 inches, we move first and document it. The GC doesn't hear about coordination problems from us—they hear about solutions."— Crew Lead, Manifold

Commissioning & Balancing
Every circuit balanced to ±5% GPM. TAB report delivered before punchlist.
Commissioning & Balancing
"Balancing is where most crews rush. We don't. I've seen data halls go down because a PDU row was 30% over-cooled and the next row was starved. Every terminal unit gets a measured GPM, logged against design, and signed. The TAB report is yours before we demobilize."— Crew Lead, Manifold

Ongoing Maintenance
Quarterly glycol sampling, annual valve cycling, emergency response within 4 hours.
Ongoing Maintenance
"We built it, so we know every valve by number. Quarterly glycol samples get sent to a certified lab—pH, inhibitor concentration, freeze point. If something's drifting, you hear from me before it becomes an event. Four-hour emergency response is a contractual commitment, not a marketing line."— Crew Lead, Manifold
Every phase is documented and transferable.
As-builts, TAB reports, hydrostatic test charts, and glycol lab results are delivered in PDF and AutoCAD format. Your facility team inherits a complete record.
Fifteen years of proof,
not promises.
Tier III / IV Projects
Completed since 2009
Uptime Maintained
Across all active maintenance contracts
Emergency Response
Contractual SLA, 24/7/365
Hydrostatic Failures
In 15 years of operation
Certifications & Standards



What engineers say
after the job closes.
"Manifold was the only mechanical sub that showed up to the coordination meeting with a marked-up P&ID. Every RFI they submitted came with a sketch and a spec reference. We didn't have a single glycol riser conflict on a 2.4 MW expansion—that doesn't happen by accident."
Derek Okonkwo
Lead Mechanical Engineer · Vantage Infrastructure Group
2.4 MW Colocation Expansion · Denver, CO
"We had a CDU line develop a pinhole on a Saturday night during peak load. Manifold had a crew on-site in under three hours, isolated the loop, and we never dropped below N+1. Their documentation made the insurance claim trivial—timestamped photos, pressure logs, everything."
Sandra Hirsch
VP of Operations
Emergency Response + Ongoing Maintenance Contract
"TAB report was on my desk two days before the punchlist walk. Every terminal unit within 4% of design GPM. I've been specifying mechanical subs for 22 years—Manifold is the first crew I've ever seen deliver that without a single revision request."
James Tillman
Senior Project Manager
Hyperscale New Build · Northern Virginia
Schedule a
Walkthrough.
A Manifold crew lead walks your mechanical room, reviews your P&IDs on-site, and delivers a written scope within 48 hours. No cost, no obligation—just an honest look at what the job requires.
Pre-visit P&ID review
Send us your drawings beforehand — we arrive prepared.
60–90 minute floor walk
We document elevations, conflicts, and access constraints.
Written scope in 48 hrs
Itemized, priced, and ready for your review.
Not ready to book?
Download our full specification sheet — pipe schedules, pressure ratings, glycol handling procedures, and certifications.
Facility Type
What kind of data center are we walking?
